Skip to main content

Morning Overview

Raytheon hires Ursa Major and Avio USA to build a second source for Tomahawk boosters

Every Tomahawk cruise missile that leaves a Navy ship or submarine rides its first seconds on a solid rocket booster, and a single supplier for that part has become a pressure point as demand for munitions climbs. On Nov. 18, 2026, Raytheon moved to change that, naming two companies it wants to build a second source.

The companies are Ursa Major, a Colorado propulsion firm, and Avio USA, the American arm of Italy’s Avio. Raytheon, an RTX business, handed them one joint, multi-year contract to design, develop and qualify a new booster for the Tactical Tomahawk.

What Raytheon awarded, and what it left out

The award was announced in a joint press release datelined Arlington, Virginia, and Berthoud, Colorado. It says the work could make both firms qualified U.S. suppliers for the Navy program, and that the partners will qualify the booster and then seek eligibility for future production orders.

Money and schedule are missing. The release gives no dollar value and no delivery dates, and Defense Daily, which reported the award on Nov. 19, likewise described the contract’s duration as unspecified. Qualification is a gate, not a purchase order: the release speaks only of eligibility for production, so no volume of boosters has been promised. Raytheon’s reasoning is stated plainly. Dual-sourcing, the company says, will increase competition, production flexibility and supply chain resilience while helping meet growing military munitions demand. Sam Deneke, president of Naval Power at Raytheon, put the aim in a single sentence: “Expanding the industrial base for Tomahawk propulsion is essential.”

Two companies, two different pieces of the job

The partners bring different strengths. Avio USA contributes solid rocket propulsion heritage, manufacturing expertise and investment in American production. Ursa Major supplies its design approach and advanced manufacturing processes, which include additive manufacturing, the industrial 3D printing of motor components.

Jason Meredith, president of Ursa Major, framed the award around volume. “Tomahawk is a critical capability for the warfighter, and meeting growing demand requires more capacity,” he said in the release. James Syring, chief executive of Avio USA, said the team was “proud to have been selected alongside Ursa Major for this important work.” Syring is a retired Navy vice admiral and former director of the Missile Defense Agency, according to the company’s boilerplate.

Ursa Major is no newcomer to Navy propulsion. In September 2024 it announced a $25 million joint investment with the U.S. Navy and the Defense Department’s Office of Strategic Capital, with $12.5 million of that from the government side, to mature manufacturing of its Lynx solid rocket motor. The work targeted propellant manufacturing, additive manufacturing and composite case winding. In December 2024 the company and Raytheon also flew a long-range solid rocket motor in a successful test for the U.S. Army.

The Virginia plant that anchors Avio’s side

Avio USA’s contribution rests on a factory that does not yet produce anything. The Tomahawk release says the award supports Avio USA’s planned southern Virginia plant, which broke ground in September. Avio’s own groundbreaking announcement places the site at the Southern Virginia Multimodal Park in Hurt, Pittsylvania County, with the ceremony held on Sept. 29, 2026. The facility is planned at about 900,000 square feet, built by HITT Contracting, to turn out thousands of solid rocket motors a year for U.S. tactical missile programs. Construction is scheduled to finish by late 2028 and production to begin in early 2029. Avio expects roughly 1,500 technical jobs, although the release’s headline says “over 1,000.” The timeline matters for Tomahawk. A booster designed and qualified now cannot ship from Hurt before the plant opens, which puts any second-source deliveries years away.

At the groundbreaking, Syring described the company’s intended business model as an “independent, open-source merchant supplier.” Bob Butz, Raytheon’s senior vice president of operations, supply chain and quality, was among the officials who gave statements for the event, as was Tim Cahill, president of Lockheed Martin Missiles and Fire Control.

How a missile’s first stage works

The Tomahawk is a subsonic, low-flying cruise missile in service since 1983, first used in combat during the 1991 Gulf War, according to the Center for Strategic and International Studies’ Missile Threat project. It can be launched from more than 140 U.S. Navy ships and submarines. Its cruise engine is a turbofan, and the length figures on that page, 6.25 meters with booster and 5.55 without, show the booster as a detachable stage that gets the missile off the launcher before the turbofan takes over.

The booster is the component Raytheon wants a second supplier for. The release does not name the current booster maker, and none of the public announcements read for this report identifies one, so the extent of the existing bottleneck is not public. Open questions remain about cost, schedule and the first production volume. Raytheon, Ursa Major and Avio USA have not published a qualification date, and the release’s only forward commitment is to seek eligibility for future production orders once the new booster passes qualification.

This article was produced with the assistance of AI and reviewed by Morning Overview editors prior to publication.


More from Morning Overview


Morning Overview is reader-supported. Some links in our articles are affiliate links, and we may earn a commission at no extra cost to you. As an Amazon Associate I earn from qualifying purchases. Full disclosure.