Congress has approved $194 million in fiscal year 2026 defense funding to replace the New York Air National Guard’s aging fleet of ski-equipped LC-130H cargo planes with a new generation of aircraft designed to land on ice sheets in Greenland and Antarctica. Senators Chuck Schumer and Kirsten Gillibrand secured the money after years of lobbying, directing it toward a brand-new LC-130J “Ski-Bird” platform for the 109th Airlift Wing at Stratton Air National Guard Base in Schenectady County, New York. The upgrade addresses a growing gap in polar logistics, at a time when Arctic competition between the United States, Russia, and China is intensifying.
What $194 Million Buys for Polar Airlift
The appropriation is earmarked to develop and procure the LC-130J, a ski-equipped variant of Lockheed Martin’s workhorse C-130J Super Hercules transport. The current LC-130H airframes operated by the 109th Airlift Wing have been flying since the 1970s, and their age has driven down mission-capable rates, limiting how often the planes can actually fly resupply runs to remote ice stations. Replacing them is not a minor refresh. The funding is meant to recapitalize the entire Ski-Bird fleet with a modern airframe built around newer engines, avionics, and structural components that can handle the punishment of repeated ice landings.
The LC-130 is one of the most unusual military aircraft in the U.S. inventory. Fitted with retractable skis alongside conventional landing gear, it can touch down on unprepared snow and ice fields where no runway exists. That capability makes it the only fixed-wing platform in the American arsenal that can deliver heavy cargo directly to research stations and military outposts deep in polar interiors. Without it, the U.S. would rely entirely on helicopters or airdrop for those missions, both of which carry significant payload and range penalties compared to a four-engine turboprop transport. For scientists working on climate and ice dynamics and for military planners worried about access to remote radar or communication sites, the difference between having a reliable Ski-Bird fleet and not having one is the difference between routine access and seasonal isolation.
Lockheed Martin’s $15 Billion C-130J Contract Vehicle
The new LC-130J will likely be produced under a massive contracting framework already in place. In July 2020, the Pentagon awarded Lockheed Martin a $15 billion indefinite-delivery, indefinite-quantity contract designated FA8625-20-D-3000. That contract covers C-130J development, integration, retrofit, and production activities for all C-130J variants, giving the Air Force a ready-made procurement pathway for the ski-equipped model. Rather than starting a separate acquisition program from scratch, the service can issue task orders against this existing vehicle to fund non-recurring engineering and initial production of the LC-130J.
This matters because defense procurement timelines are notoriously slow. A clean-sheet program would face years of contracting, design reviews, and congressional oversight before a single airframe rolled off the line. By channeling the LC-130J through an established contract, the Air Force can compress that timeline and begin integrating ski-landing systems onto the proven Super Hercules platform sooner. The $194 million appropriation represents the initial investment, covering early development and engineering work. Full fleet replacement will almost certainly require additional funding in future defense budgets, but the first tranche gets the program moving and signals to industry that specialized polar airlift remains a funded requirement rather than a niche capability left to atrophy.
Why Greenland Keeps Coming Up
The headline capability of the Ski-Bird is its ability to operate on the Greenland ice sheet, a location that has taken on sharply increased strategic significance. Greenland sits astride key Arctic shipping lanes and offers early-warning radar positioning for North American missile defense. The 109th Airlift Wing has for decades flown LC-130H missions to support the National Science Foundation’s polar research programs, ferrying scientists, fuel, and equipment to stations that are otherwise inaccessible for most of the year. Those same logistics routes double as military supply lines in a contingency scenario, allowing the United States to surge people and materiel into austere locations without waiting for port infrastructure or prepared runways.
Russia has been rebuilding Soviet-era Arctic bases and expanding its northern fleet for over a decade, while China has declared itself a “near-Arctic state” and invested in icebreakers and polar research infrastructure. The United States, by contrast, has let its polar logistics fleet age without replacement. The LC-130H airframes are more than 50 years old in some cases, and their declining availability has forced the 109th to stretch maintenance cycles and accept reduced sortie rates. A fleet of new LC-130J aircraft would restore reliable access to ice-field landing zones and signal that Washington takes Arctic presence seriously, not just rhetorically but with hardware on the tarmac. In Greenland specifically, the ability to sustain year-round operations from interior ice fields underpins both scientific projects and the broader U.S. strategy of maintaining a foothold in a region where physical access is a prerequisite for influence.
Congressional Momentum on Aviation Modernization
The Ski-Bird funding did not emerge in isolation. The Senate Appropriations Committee has been building momentum around aviation modernization across multiple defense budget cycles, including investments to refresh aging tactical airlift fleets in its fiscal year 2025 defense bill summary. That broader push to recapitalize platforms like the C-130J gave Schumer and Gillibrand a legislative opening to argue that the LC-130 program deserved its own dedicated funding line rather than competing for scraps inside a general airlift procurement account. By framing the Ski-Bird as both a unique national asset and a logical extension of existing modernization efforts, the New York delegation aligned local priorities with a wider Pentagon narrative about readiness and resilience.
The political dynamics here are straightforward. Stratton Air National Guard Base in Schenectady County is a major employer in upstate New York, and the 109th Airlift Wing is the only military unit in the world that operates ski-equipped Hercules aircraft. Letting the fleet age out would not just erode a military capability. It would eliminate a mission set that defines the base’s reason for existence. Schumer, in a statement accompanying the funding announcement, framed the appropriation as the result of “years of direct advocacy” to protect both the strategic mission and the local workforce. That dual argument (national security plus economic impact) has long been one of the most durable formulas for sustaining specialized capabilities that might otherwise be vulnerable in a zero-sum budget fight.
What Comes Next for the Ski-Bird Fleet
With the initial $194 million now in place, the next phase will involve translating congressional intent into specific engineering milestones and production decisions. Air Force acquisition officials will have to determine how extensively the LC-130J differs from the baseline C-130J, from structural reinforcements around the landing gear to the integration of ski assemblies and cold-weather survival systems. Each design choice carries trade-offs in cost, weight, and performance, and the program will need to balance the 109th Airlift Wing’s operational wish list against the imperative to keep the variant as common as possible with the standard Super Hercules. The more components the Ski-Bird shares with other C-130Js, the easier it will be to sustain over decades of polar operations.
At the same time, the Guard unit in New York will be preparing for a transition that affects everything from pilot training pipelines to maintenance tooling. Crews accustomed to coaxing extra life out of aging LC-130Hs will have to adapt to a new cockpit layout, updated digital avionics, and potentially different handling characteristics on snow and ice. For the National Science Foundation and other polar stakeholders, the payoff will be measured in more predictable flight schedules, greater payload capacity, and a reduced risk that a single mechanical failure could strand a field camp at the end of the world. For defense planners, the measure of success will be whether, a decade from now, U.S. forces can still put heavy cargo and people precisely where they are needed on the Greenland and Antarctic ice sheets—regardless of who else is vying for influence in the high latitudes.
More from Morning Overview
*This article was researched with the help of AI, with human editors creating the final content.