Image Credit: Johannes Reimer - CC BY 4.0/Wiki Commons

Across the planet, governments and engineers are sketching projects so vast that they read like science fiction. From desert cities in glass walls to artificial stars and brand‑new capitals, these mega‑builds are attempts to rewrite how humanity lives, moves, and powers itself.

What unites them is not just scale but ambition: each one tries to solve a structural problem, whether climate risk, energy demand, or overcrowded cities. I see them as stress tests for our species, revealing how far we are willing to push technology, finance, and politics to reshape the future.

The Line and the shrinking dream of limitless urbanism

Few projects capture raw ambition like the linear city planned in the Saudi desert. Marketed as part of NEOM, The Line was introduced as a radical alternative to the car‑centric metropolis, stacking homes, offices, and parks inside two parallel skyscrapers in the sand. Official material describes it as part of “THE FUTURE OF URBAN LIVING,” a cognitive city stretching across 170 kilometers, with high‑speed transit promising end‑to‑end journeys in 20 minutes. In promotional videos, the mirrored walls rise taller than the Empire State Building, turning the project into an instant global symbol of mega‑scale design.

Reality has already forced that vision to bend. Reporting on The Line notes that by 2025 the scheme had been substantially scaled down, with Saudi Arabia aiming first at a 5 km core described as 3.1 m in length in the source text, a sign of how far the original horizon has narrowed. Coverage of the broader NEOM plan highlights a $500 billion budget for the Megacity and a long list of engineering and financing hurdles. Video investigations into The Line and other NEOM districts describe an enormous $1 trillion project whose early phases remain concentrated around a limited stretch of construction, while another analysis of what is happening now on site underscores how much of the original 170 km remains theoretical.

Political priorities are shifting too. One report describes how Your support is contrasted with the sense that the Riyadh leadership has, for Now, pulled focus away from the most extreme elements of the scheme. Separate coverage of Vision 2030 notes that Saudi Arabia is preparing to scale back its flagship NEOM project, even as Crown Prince Mohammed Bin Salman keeps it as a central pillar of his economic transformation agenda. For me, The Line has become a live case study in how mega‑builds collide with fiscal reality, public skepticism, and the limits of construction capacity.

ITER and the quest to bottle a star

If The Line tries to reinvent the city, ITER tries to reinvent energy itself. At its core, the project is an attempt to build an artificial sun on Earth, using a tokamak reactor to fuse hydrogen isotopes and release vast amounts of power. The official project description presents ITER as a multinational collaboration that will test whether fusion can be a practical power source. A detailed briefing on ITER explains that the facility, previously known as the International Thermonuclear Experimental Reactor, is designed to generate about 500 M of fusion power over 40, a scale that would mark a step change from previous experiments. Another technical overview refers to The ITER Fusion Reactor as one of the most challenging project management tasks on the planet, with The ITER team trying to balance the objectives of all participating members.

Delays and cost overruns have become part of the story. A project summary notes that ITER has proposed a new timeline, with an initial phase of operations now targeted for 2035 after technical issues and quality problems forced a reset. A separate analysis of whether ITER has been a failure points out that construction, which began years ago, has seen the target for first plasma pushed back to 2034. Video commentary on the International Thermonuclear Experimental Reactor, sometimes nicknamed Eater, frames the latest delay as another blow to the idea that fusion is just around the corner, while another explainer asks if the world’s largest fusion project is effectively stalled. For all the setbacks, I see ITER as a reminder that the most transformative mega‑builds are less about concrete and steel than about patience, governance, and the willingness to fund experiments whose payoff may not arrive for decades.

Nusantara and the $100 Billion age of instant capitals

Not every mega‑build is about a single structure; some are about moving an entire seat of power. Indonesia’s decision to shift its capital from congested, sinking Jakarta to a new city called Nusantara is one of the boldest examples. The project is part of a wider wave of “instant capitals” that a video on Inside the $100 Billion Dream describes as “Mega Capitals Built from Scratch,” highlighting how governments are pouring up to $100 Billion into new administrative hubs. In that breakdown, Nusantara is introduced as part of a group of five such cities, with $35 billion attributed to Indonesia’s own plan. A separate knowledge panel on Nusantara situates the city on the island of Borneo and frames it as a long term response to environmental and demographic pressures.

What strikes me about Nusantara is how it compresses decades of urban growth into a single political cycle. The “From Indonesia” framing in the Billion Dream video places the project alongside other Mega Capitals Built from Scratch, suggesting a new era in which leaders try to buy their way out of legacy infrastructure problems. That approach carries obvious risks: instant cities can struggle to attract residents, and the debt burden can linger for generations. Yet Nusantara also shows how mega‑builds are increasingly framed as climate adaptation tools, not just vanity projects, with planners explicitly trying to move people away from flood‑prone land. In that sense, it belongs in the same conversation as the protective infrastructure highlighted in another video that surveys From the Fukushima Ice Wall in Japan to Venice’s MO Project and the Great Green Wall in Africa.

Trans‑European networks and the hidden mega‑grid

Some of the most ambitious projects on Earth are not single landmarks but networks that quietly knit regions together. In Europe, the Trans‑European Transport Network, often shortened to TEN‑T, is a prime example. A breakdown of future infrastructure lists the Trans European Transport Network among the “Future in the Making: Top 10 Mega Projects Shaping Our World Beyond 2030,” assigning it a budget of $600 Billion. That same overview, labeled as Future in the Making and “Top Mega Projects Shaping Our World Beyond” 2030, places TEN‑T alongside data centers and other digital infrastructure, underscoring how physical and virtual networks are converging.

What makes TEN‑T so ambitious is its attempt to standardize and upgrade thousands of kilometers of rail, road, and port infrastructure across dozens of jurisdictions. Unlike a single skyscraper or dam, this kind of mega‑build is as much about regulation as it is about engineering. I see it as a template for the next generation of global projects, where the real challenge is aligning standards, funding models, and timelines across borders. The same list that highlights the European Transport Network also nods to hyperscale computing facilities, such as a Microsoft and OpenAI data center expected to commence by 2028, hinting at a future in which mega‑builds are judged not only by concrete poured but by the bandwidth and resilience they deliver.

More from Morning Overview